Point 1
Orders are 24 days late against a usual 4.86-day rhythm, worth £38,508.52 per month
“I noticed it's been 24 days since your last order with us, which is well outside your usual rhythm of around every 5 days, is everything alright on site?”
Long Lever Intelligence 360·Demonstration only: all companies, people and figures are fictionalNo real business data is used. Any resemblance to a real business is coincidental.
Back to Long Lever PartnershipsCall briefing · VC-1315 · London & South East
Sutton · Emma Tremaine · prepared 9 November
Company AT (ref VC-1315) is a trade installer based in Sutton with 3 branches, buying from Long Lever Supply since January 2024 through technical director Emma Tremaine. Sales over the last twelve months stand at £462,102.21, down 11.42% on the prior year's £521,704.85. They order on a tight rhythm, typically every 4.86 days with orders placed in all 12 of the last 12 months, and they sit in good standing with 66.72% of their £152,000 credit limit drawn.
Searches, quotes and baskets that never reach the ERP.
Across the three largest gaps, Company AT is spending £82,158.28 less than the peer median in the same size band, with the biggest single gap in Access hardware where they spend only £43.91 against a peer median of £38,918.59. Door entry and Cabling show similar patterns, at gaps of £25,489.36 and £17,794.24 respectively, suggesting this spend is currently going to another supplier.
Offer: Access hardware + Cameras, led by Brand 21 Turnstile Gate Controller, attached to the Cameras they already buy
Point 1
Orders are 24 days late against a usual 4.86-day rhythm, worth £38,508.52 per month
“I noticed it's been 24 days since your last order with us, which is well outside your usual rhythm of around every 5 days, is everything alright on site?”
Point 2
Abandoned basket of £3,310.88 left on the website on 29 October
“I saw you had some encoders and PTZ cameras sitting in your basket worth £3,310.88, shall I get that order moving for you?”
Point 3
Access hardware spend gap of £38,874.68 against the peer median
“Most installers your size are spending close to £38,900 a year on access hardware with us, but you're on £43.91, is that something you're buying elsewhere?”
Watch out
Google reviews have slipped to an average of 3.8 in November 2026 from 4.3 in June 2026, with recent comments citing slow call-outs and delays waiting on spare parts, which could make the buyer defensive if service issues come up during the call.
Written from the account’s order history, product mix, trade-site activity and action log. Every figure was calculated by the platform before it was written up. Fictional demonstration data.